Area Wide Pavement Treatment

The pavement condition along Porangahau and Wimbledon Roads varies and has undergone large numbers of historic pavement treatments (dig out the failed pavement surface and reinstate with better gravels and reseal the surface). 

Pavement treatment requirements to increase the pavement strength to carry HPMV loadings on Porangahau Road and Wimbledon Road have not been defined, however some Area Wide Pavement Treatments are proposed in localised areas. 

A drive over visual assessment has been carried out in conjunction with a review of previous pavement treatments to determine priority areas where new treatment should be implemented. Three sections were identified as the highest risk to failure in the short term, two of these are currently being competed onsite. The third section (on Wimbledon Road) is not yet programmed but likely to be completed during 2021. 

Complete: 

Site: Porangahau Road (200m length (RP7.987 ‐ 8.187) and 409m length (RP8.557‐8.966) 

Contractor: Russell Roads 

Construction: road pavement treatment and road widening. Completion Jan 2021

Key Stats

  • 9844 litres of bitumen used 

  • 4922m2 of chipseal used 

  • 38 people working across this project 

UPDATE - 24 DECEMBER 2020

The project is complete with only a small portion of drainage works to complete.

24.12.20 Porangahau Rd AWPT

UPDATE - 04 DECEMBER 2020

flyover of the area wide pavement treatment project has been created to showcase the work undertaken.

UPDATE - 30 NOVEMBER 2020

The project is progressing well with the road stripped back and rebuilt in preparation for stabilisation and a top coat.

30.11.20 Porangahau Rd AWPT

UPDATE - 02 OCTOBER 2020

Project signboards are being printed and will be onsite next week.

C1077 Signboard

UPDATE - 30 SEPTEMBER 2020

The scope of work includes:    

  • Earthworks including carriageway widening and shoulder improvements 
  • Reshaping of roadside drainage. 
  • Rehabilitating the existing pavement via cement stabilisation  
  • Overlaying with a new cement stabilised basecourse layer. 
  • Chip-seal surfacing and line marking. 

Porangahau Rd Site 1 is approximately 200m long between RP 7.99 – 8.19.   The treatment for this section involves the renewal of the existing pavement and road shoulder widening with new surfacing. 

C1077 Site 1 PWPGF004

Porangahau Rd Site 2 is approximately 400m long between RP 8.56 – 8.97. The treatment for this section is the same as Site 1 

C1077 Site 2 PWPGF004

UPDATE - 24 SEPTEMBER 2020

Council has awarded a contract to Russell Roads to commence AWPT at two sites on Porangahau Road - works are expected to commence early October 2020.

 

C1077 Tender Drawings

Loading...

Central Hawke's Bay District Council - Copyright © 2024 Central Hawke's Bay District Council

Disclaimers and Copyright
While every endeavour has been taken by the Central Hawke's Bay District Council to ensure that the information on this website is accurate and up to date, Central Hawke's Bay District Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Central Hawke's Bay District Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Central Hawke's Bay District Council - / +64 6 857 8060 / customerservice@chbdc.govt.nz